The depth with the piles is determined by the soil circumstances and the load necessities in the project. Piles are usually driven or drilled right up until they attain steady soil or bedrock, which can vary from a few meters to various dozen meters, according to the location.Vital position for shear on vertical part throughout total width of pile-